The News Courier in Athens, Alabama

Local News

July 11, 2013

NRC: TVA nuclear plant still needs improvement

— ATLANTA (AP) — The Tennessee Valley Authority has fixed the immediate problems that led to a serious safety violation at its Browns Ferry nuclear plant in Alabama, but it must still demonstrate long-term improvement, federal regulators said Thursday.

The initial findings by the U.S. Nuclear Regulatory Commission come from an in-depth inspection triggered by a serious safety violation issued in mid-2011 against the plant near Athens, Ala. The NRC had issued only five such red findings — its most severe citations — up to that point. It came after the agency investigated how a valve on a cooling system on the Unit 1 reactor became stuck shut, which could have left equipment used to cool hot, radioactive nuclear fuel inoperable.

The plant still had other cooling systems. But the failure would have been a major problem during a fire since emergency plans called for preventively shutting down other equipment and using the damaged system.

Federal authorities were troubled because workers failed to quickly notice that the valve was broken, pointing to a weak safety culture. The equipment failure never caused a serious problem at the facility.

"They have a higher regard for a stronger safety culture at the station," said NRC branch chief Eugene Guthrie, who oversees the federal inspectors at the plant and headed the in-depth inspection. "It starts there. But all of that needs to be reinforced in the worker behaviors as they perform their routine duties and responsibilities in the field."

NRC officials still rank the Unit 1 reactor at Browns Ferry as one of the worst-performing nuclear plants in the country. Federal officials will rely on the results of future inspections and reviews to determine whether they upgrade the plant's rating, which affects the level of NRC scrutiny it receives.

The intensive review uncovered potential low-level violations, though they are not considered serious. Guthrie declined further comment on those issues, though they will be made public later. A final inspection report is expected in August.

Text Only
Local News
Poll

What is your favorite Easter candy?

Chocolate bunnies
Marshmallow chicks
Chocolate eggs with filling
     View Results
Facebook
AP Video
Raw: Royal Couple Visits Australia Mountains Raw: Pro-Russian Militants Killed on Base Captain of Sunken South Korean Ferry Apologizes Boston Bombing Survivors One Year Later Sister of Slain MIT Officer Reflects on Bombing Raw: Blast at Tennessee Ammunition Plant Kills 1 Hoax Bomb Raises Anxiety in Boston Egypt Clamps Down on Mosques to Control Message After Fukushima, Japan Eyes Solar Power New York Auto Show Highlights Latest in Car Tech Ex-California City Leader Gets 12 Year Sentence Disbanding Muslim Surveillance Draws Praise Hundreds Missing After South Korean Ferry Sinks Passengers Abuzz After Plane Hits Swarm of Bees Town, Victims Remember Texas Blast At Boston Marathon, a Chance to Finally Finish Are School Dress Codes Too Strict?
Twitter Updates
Hyperlocal Search
Premier Guide
Find a business

Walking Fingers
Maps, Menus, Store hours, Coupons, and more...
Premier Guide
Stocks
Parade
Magazine

Click HERE to read all your Parade favorites including Hollywood Wire, Celebrity interviews and photo galleries, Food recipes and cooking tips, Games and lots more.
Business Marquee